1. Purpose In order to stabilize the quality of exported mineral products, meet the requirements of the next process for ore quality, and continuously improve the ore recovery rate and improve the comprehensive economic benefits of mining, this method is formulated. 2, term / definition 3. Scope of application The present Measures are applicable to the production and operation units of the Huashugou Mining Area and the Heigou Mining Area, and the Production Command and Control Center. 4. Management duties 4.1. The production command center is responsible for the preparation of the monthly quality plan and the weekly transportation and ore distribution plan, and is responsible for the rationality and feasibility of the plan. And supervise the implementation of the inspection plan. 4.2 Production Command Center The production planning group is responsible for the issuance of the weekly distribution plan, and is responsible for the accuracy and effectiveness of the ore mining and distribution instructions. 4.3 The production and control center geodetic test group has the right to make temporary adjustments to the monthly quality plan and the weekly distribution plan according to the requirements of the users, the quality of the products, and the quality of the ore produced in the stope. The relevant departments of the production command and control center shall adjust according to the regulations. The plan is to issue instructions. 4.4 Each production operation unit shall organize production according to the quality planning requirements and strictly in accordance with the production process operation documents, and be responsible for the quality of the products produced by the unit. 5. Operation requirements and assessment 5.1 Mining operation requirements and assessment 5.1.1 The mining operations of each ore body in the Huashugou mining area shall, in principle, be implemented in the mining area according to the following table. A wear priority with C or Ding wear ore, it is strictly forbidden to wear the mine alone, the mining site does not match the mine, the inspection is found once, the assessment operation area is 2 points. Mining operation and mining table in Huashugou mining area Simultaneous recovery Piercing Rock mixing rate% Wearing a nail B wearing C wear Ding wear Remarks Wearing a nail ≤5 Matching with other wear 1:(5-6) (1-2): 1 (3-5): 1 Measured according to the number of mining equipment B wearing 10-20 To be mixed (3-4): 1 6:1 C wear 20~30 To be mixed To be mixed Ding wear 30~40 To be ore or to terminate mining 5.1.2 The principle of parallel retreat should be maintained between the excavation roads. At least four or more access roads should be reclaimed at the same time to prepare for ore. If the ore source is insufficient, the inspection will find a responsible unit. 2 minutes. The special section is confirmed on the spot by the quality management department and a written opinion is issued. The production unit organizes the production according to the written opinions issued by the quality management department. 5.1.3 The mining operation in the Huashugou mining area shall be carried out according to the technical management system combining the cut-off grade and the total output of the mine. The main points are: 5.1.3.1 The stepping of the mine shall not be terminated once until the cut-off grade or the target recovery rate is reached. It shall be divided into several times according to the requirements of Table 5.1.1, alternately matched with the adjacent approach step, balanced out of ore, and To the "poor and rich mix, powder mine and lump ore, difficult to combine and mining", did not find an assessment of 2 points. 5.1.3.2 Cutting and rock interlayers should control the amount of rock as much as possible. It should be matched with pure ore at 1:5. The combined rock volume should be controlled at 20-30 bucket (scraper) to meet the next round of mining blasting. The compensation space can be used, and a large number of rock outs are treated according to the “Product Quality Management Measuresâ€. 5.1.3.3 Under normal circumstances, if the amount of ore out of the step is less than 30% of the amount of caving, even if a large amount of overburden is present at the beginning, it should be regarded as an abnormal ore-out. Under normal circumstances, it should continue to be mined with other wear. According to the reflection of the production unit, the quality management department supervises the mining on the spot. If the ore discharge has reached 30-40% of the collapse, if there is still no improvement trend, the mine can be terminated and the next round of mining and blasting will be carried out. Otherwise, According to the rules, the rock is discharged. 5.1.3.4 For blasting accidents such as overhanging and pushing, it shall be dealt with in time to prevent the ore loss caused by overhanging and pushing, and the ore source is insufficient to affect the ore blending. Otherwise, it shall be assessed according to the relevant provisions of the “Administrative Measures for Mining Technologyâ€. 5.1.3.5 When the cumulative amount of ore out of the step has reached the target recovery rate, the mine can be terminated to prevent over-exploitation and over-excavation; even if the target recovery rate has been reached in the face of each section, the ore surrounding rock of the face is mixed. If the rate is less than 20%, it can be seen that the horizontal recovery is sufficient, etc., and the mixed mining to the surrounding rock mixing rate of 40% is terminated. There is no excessive over-excavation and over-excavation for no reason, and the equilibrium is degraded, and each inspection is 4 points. 5.1.3.6 When the rock mixing rate of the face is 40% and the ore discharge does not reach the planned mining amount (calculated according to the target recovery rate), it shall be treated according to 5.1.3.3. 5.1.3.7 If “dumplings†are found during the mining process, the mine shall be mined under the guidance of the technical quality management personnel of the quality management department. 5.1.3.8 Make the original record of mining and mining, and faithfully reflect the quantity and quality of the ore mining. The original records are missing, distorted, and the records are not standardized. Each assessment is 2 points. 5.1.4 The mining of the stope in the black trench open-pit mining area shall be strictly implemented according to the monthly quality plan, and the planned execution deviation is large, and the assessment operation area is 5 points. 5.1.5 When the ore production and quality plan are affected due to changes in geological boundaries, the black trench operation area must be communicated and negotiated with the production command center in time to ensure the balanced implementation of the plan. The communication was not timely, the impact indicator was completed, and the assessment operation area was 5 points. 5.1.6 The operation area of ​​the black ditch should be based on the distribution of the ore grade of the stope. When there are two ore blocks at the same time, it should be rich and poor, and the mine should be properly matched. It is strictly forbidden to concentrate the single ore block. No ore, single block mining, inspection found once, assessment work area 6 points. 5.1.7 When mining at the junction of rock and rock, if the stope has the conditions of sub-wearing and detonation, it should be divided and blasted. It is strictly forbidden to mix and blast the ore, otherwise it will be assessed according to the relevant provisions of the “Product Quality Management Measuresâ€. 5.2 Shipping operations and mining requirements and assessment 5.2.1 The production control center of the production command and control center shall prepare the weekly distribution plan in a timely manner. The production command and control center shall coordinate the production according to the daily output of the Huashugou mining area and the weekly distribution quality plan. The weekly distribution plan is not timely. The irrational and weekly distribution plan was executed incorrectly, and the responsible person was assessed 2 points/time. 5.2.2 Dispatching of production command and control center should keep track of the emptying height and depositing capacity of all the wells. The emptying height of No22, No24 and No25 in the western area should be controlled within 40 meters, and the emptying height of the black gully should be controlled at 40. Within meters, the height of the emptying of the chute exceeds the standard, and each responsible unit is 2-5 points (depending on the height difference). 5.2.3 If there are factors such as well shed, well air and equipment failure in production, and the production cannot be completed as planned, the dispatch of the production command and control center should be negotiated with the local survey team in time to adjust the proportion of the ore. 5.2.4 The V ore body is a high-sulfur and low-grade ore body. It must be strictly organized according to the daily plan. No special conditions are allowed to overproduce, so as not to affect the 2640 level output transportation and mineralization and the decline of comprehensive indicators. 5.2.5 When the underground ore bodies need to increase or decrease the output, the output should be adjusted in the same proportion and simultaneously; when the individual ore bodies increase or decrease the output, they must be adjusted after the production command and control center agrees to adjust. 5.2.6 Wells No22, No24 and No25 in the West District are not allowed to be exported separately; it is necessary to carry out ore production according to the weekly distribution plan of each well in the Eastern District. The West District slippery ore is separately exported, and each person responsible for the assessment is 5 points. 5.2.7 There is no special reason, it is not allowed to adjust the proportion of mines in the east and west areas. If it is necessary to increase production or reduce production due to export reasons, each chute should be increased or decreased according to the plan. The proportion of pulling mine should be controlled at ±5%, otherwise, the relevant responsible person should be assessed 2 points. 5.2.8 When the ore quality of the chute output fluctuates, the production command and control center shall adjust the proportion of the slipping well in time according to the quality information of the chute and the main chute in the mining area. The relevant departments of the production command and control center shall also be tested according to the production command and control center. The adjusted proportion of the group will adjust the transportation volume of the relevant chute in time, and the adjustment of the proportion of the ore will not be timely or the implementation will be weak, and the relevant responsible person will be assessed 2 points. 5.2.9 Production command and control center should have a day beneficiation plant to provide quality information, identify problems and timely consultation and related sectors and to develop appropriate improvement measures to guide production, quality information feedback is not timely, or the information is incorrect, assessment persons responsible 4 Minute. 5.2.10 The transportation level of 3400 shall be organized according to the principle of “two wells and three linesâ€. It is required that the 1# and 2# chutes shall be distributed according to the number of wagons, otherwise the responsible unit shall be 5 points. 5.2.11 2640 Transportation level It is strictly forbidden to set up the supervision personnel of each underground production unit, and each time the assessment responsibility unit is found 10 points. 5.3 Assignment requirements and assessment of operation operations 5.3.1 The operation and operation area must organize production according to the dispatching production instructions. The equipment failures and quality abnormalities in the well shed, well air, chute facilities and transportation lanes that occur during transportation should be dispatched to the center in time for feedback. Relevant information feedback is not timely, affecting the responsibility of the distribution assessment 2 points. 5.3.2 The distribution of mines in the east and west areas, the two trains in the western area shall not be unloaded continuously on the same curved track, and shall be unloaded at intervals with the ore of the well-quality well in the eastern area. Otherwise, the inspection shall find an assessment of 3 points. 5.3.3 Operational operation area When organizing pre-selection ore production, production should be balanced in strict accordance with the dispatching instructions of the production command and control center, and the production should not be adjusted at will. Otherwise, the person responsible for the assessment will score 2 points. 5.3.4 Block mineral magnetic separator and powder mine magnetic separator start ratio of 3:6, 3:7 or 4:7, not allowed 2:6 or lower, to ensure the matching of powder ore and lump ore, otherwise, inspection found 2 points in one assessment. 5.3.5 The pre-selection operation does not allow the separate operation of the powder ore magnetic separation operation. Otherwise, the inspection is found once and the assessment operation area is 5 points. 5.3.6 When the ore quality shows signs of fluctuation, the operation area should actively cooperate with the investigation work carried out by the production command and control center, and cooperate with the non-active, assessment work area of ​​5 points.
Precision alloys usually refer to functional metals with special physical properties, such as magnetic, electrical, and thermal properties, including magnetic alloys, elastic alloys, and expanded alloys. The precision alloys produced by Seonjip are mainly used in industries such as electronic devices, instruments and so on.
Kovar Sheet,Invar 36 Bar,Invar 36 Round Bar,Nickel Steel Alloy Invar Jiangsu Seonjip Technology Co.,Ltd. , https://www.seonjip.com