First, the basic principles

After the roof accident occurs, the trapped personnel should be rescued quickly and ventilation should be resumed.

First, you should contact the trapped person directly (call, tap, use a geophone, etc.) to determine the location and number of people trapped. If the location of the trapped person is not well ventilated, it is necessary to try to strengthen the ventilation and use the air duct, water pipe, tunneling, drilling, etc. to deliver fresh air, drinks and food to the trapped person. If you are aware of the danger of falling again, immediately strengthen your support and be prepared to make a safe exit. When working in the landing area, you should send someone to observe the changes in the surrounding roof, pay attention to check the gas changes. When removing the falling meteorites, you should use the tools carefully to avoid harming the trapped people. Different salvage methods should be adopted according to the scope of the roof accident and the ground pressure.

Second, the mining process roof coal mining face accident

The trapped person should be rescued first, followed by measures to resume production. The method of treatment should be based on the height of the falling rock formation, the blockage of the falling rock, the location of the roof and the size of the roof. At the same time, it is necessary to take corresponding measures according to the thickness of coal seams and coal mining methods.

1. Local small topping treatment method

It is generally taken to dig the nest beam using one leg or hanging metal shed roof beam treatment.

2, the treatment method of the big top

(1) The whole lane method handles the roof. The scope of influence is not large, the roof area is no more than 15m, and the meteorites that are smashed down are not large. After taking certain measures, they can be handled by hand. The whole roadway method can be used to deal with the roof, that is, the method of restoring the working face.

(2) Open the roadway around the roof area. Generally, when the influence range of the roof is large, it is not suitable to use the whole lane method. The method of opening the roadway to bypass the roof area can be adopted, which is called the method of partially re-cutting the open cut and re-cutting the open cut. There are three situations depending on where the roof area is located on the work surface:

The roof collapse occurs at the end of the working face: the coal can be re-opened from the return air passage along the working face to bypass the roof area. If the area of ​​the roof is large, the meteorite blocks the roadway, causing the accumulation of gas in the return air passage of the goaf, which can be eliminated by temporary windshield or temporary local ventilator.

The roof area is in the middle of the working surface: it can be left parallel to the working surface to leave a 3m-5m coal pillar and reopen a cutting lane. The brackets of the new cut lanes can be determined according to the condition of the roof. Generally, a beam and two column sheds are used.

The roof area is on the head side of the working face: the treatment method is basically the same as the roof area in the tail side of the processor, that is, the coal gang misses a section of 3m-5m coal pillars, and a roadway is made from the wind side to the working surface to communicate with the working surface. .

Third, the handling of roof accidents in the face

Before handling the fallen roadway, the shed and the shed should be used to strengthen the maintenance of the roadway near the roof. While maintaining the roadway, it is necessary to send a special person to observe the roof to prevent the expansion of the roof. There are four methods for dealing with fallen roadways: the raft method, the shed method, the wedge method, and the bypass method.

1. Wood raft method: This is a commonly used method for dealing with fallen roadways. It is generally divided into two treatment methods: “well” word raft and “well” word raft and small shed.

2, take the arbor method: Roof at the falling of the arch height of no more than 1m, and the top caving slate Stone does not continue. When the length of the roof is not large, you can use 5-8 long materials to hang on the two brackets that are intact. This is the shed method. Then, under the cover of the gazebo, the shovel and shed are carried out. After the shed is completed, the top plate is connected with materials on the pergola. This method is not suitable for use in high gas mines.

3, the wedge method: When the roof rock is very broken and continues to fall, unable to clean up the falling objects and the shed, the wedge can be used to treat the fallen roadway.

4. Ways of bypassing: When the length of the roof road is small, it is difficult to handle, and the serious situation of blocking people is caused, in order to find ways to deliver fresh air, food and beverages to the trapped people, and quickly rescue the trapped people, you can take a bypass. The method of bypassing the landing zone for rescue.

ISO/IDF Sanitary Pipe Fittings

Kaysen Steel is a manufacturer and supplier of Stainless Steel ISO/IDF Sanitary Pipe Fittings, ISO/IDF Hygienic Fittings, ISO/IDF food grade fittings,Material in SS304 & SS316L, Standard including 3A, DIN, SMS, BS, RTJ, ISO, IDF, DS, INCH, etc,size from 1/2" to 12". Including sanitary elbow, sanitary tee, sanitary reducer, with Welded, Tri-Clamped, Threaded ends, which is used in Food, milk, beer, brewage, pharmacy, comestic, biopharmacy, etc.

Welcome to buy ISO/IDF sanitary pipe fittings, ISO/IDF Hygienic Fittings,ISO/IDF food grade fittings from us in wholesale price, if you have any questions or requests, pls feel free to contact us!


ISO/IDF Sanitary Pipe Fitting Specification:
â–ª Standard: 3A, DIN, SMS, BS, RTJ, ISO, IDF, DS, INCH, etc
â–ª Material: Stainless Steel 304 (1.4301), Stainless Steel 316L(1.4404) etc.
▪ Size Range: 1/2″ to 12″ / DN15 ~ DN300
â–ª Connection Type: Welded, Tri-Clamped, Threaded

Surface Finish:
Mechanically polished and electropolished are available for our products. Outside and Inner surface can be treated complied to specified needs, and to meet FDA, GMP requirement.
Tube and Fittings: Ra0.4, Ra0.6, Ra0.8 or specified, Both outside and inner available.

Quality & Inspection:
â–ª PMI test to verify material grade
â–ª Dimension controlling during fabricating and finished
â–ª Visual and surface 100% examination before shipment
â–ª Packed in carton box firstly, then in wooden case

ISO/IDF Sanitary Pipe Fittings,ISO/IDF Sanitary Fittings,ISO/IDF Hygienic Fittings,ISO/IDF Fittings,ISO Fittings,IDF Fittings

Kaysen Steel Industry Co., Ltd. , https://www.chinasanitaryvalve.com